Configuration 1: R8r <—ppp—> R8si
63
Administration for Network Connectivity
555-233-504 — Issue 1 — April 2000 CID: 77730
3 C-LAN Administration
Switch 1 Task — Assign Link via ppp Data Module to Switch 2
This task administers a ppp data module on Switch 1 for the ppp connection to Switch
2. The data module defines a network interface — it associates a link number with a
port address and node name for the C-LAN port on Switch 1. It also specifies the
node name for the destination node, which is a C-LAN port on Switch 2.
Begin
Steps
>
Open Data Module form — enter ad da n
[The system assigns the extension 2010 to this data module. Instead of n (next) in the
command line, you could specify any unused extension in the dial plan.]
> Enter values
add data-module next
Page 1 of x
DATA MODULE
Data Extension: 2010 Name: _ppp on link 1 to node-2___ BCC: 2
Type: ppp COS: 1
Port: 01b0115 COR: 1
Link: 1_ TN: 1
Enable Link? n
Node Name: node-1 _____
Subnet Mask: 255.255.255.0
Establish Connection: y
DESTINATION
Digits: 6113020
________
Node Name: node-2_________
CHAP? n
Field Conditions/Comments
Type: This indicates the data-module type for this connection (ppp).
Port: In this example, the C-LAN circuit pack is in slot 01b01; the ppp
connection is through port 15.
Link: For G3r, the link number must be in the range 1 – 33, not
previously assigned on this switch.
Enable Link? If you need to add an IP route that uses this node as a gateway,
this field must be set to
y before adding the IP route. Otherwise
leave this field set to
n until the link administration is complete;
that is, until after all data modules and the processor channels are
assigned, then set to
y.
Name: Information-only; appears in list generated by the "list data
module" command.
1 of 2