Cabletron Systems 1800 Switch User Manual


 
Chapter 12
Configuring Async Ports
Introduction
The integral Async PAD function in the SmartSwitch 1800 allows asynchronous
devices to connect to a frame relay or X.25 network.
Required Configuration
To run a port as an integral async PAD in a SmartSwitch 1800, make sure the fol-
lowing are properly configured:
Node parameters (Chapter 4). This is general configuration that must be done
no matter which protocols will be run in the node.
Async PAD Profiles (page 12-2), which define the operation of the attached
devices.
Login parameters (page 12-7), which define passwords to be used when logging
into the SmartSwitch.
Loaded protocols (Chapter 5): Async, plus frame relay or X.25.
Async port(s) (page 12-8), plus frame relay (Chapter 7) or X.25 (Chapter 8)
port(s) that will connect to the user device(s) and network.
Subscriber IDs (page 12-15), which identifiy user devices to each other and the
SmartSwitch.
Abbreviated address(es) (page 12-17), if desired. This feature (described later in
this chapter) allows short "nicknames" to be assigned to subscriber addresses, to
ease entry of addresses.
PVC connections (page 12-18), which create "permanent" connections between
two ports in the node. A PVC can be created between two async ports or
between an async port and an X.25 port.