19-16 SmartSwitch 1800 4.0 User Guide, Rev 01
Initiating Frame Relay Backup Switchover/Switchback
Frame Relay backup DLCIs can be configured (as described in Chapter 7) to automat-
ically become operational a set time after failure of a primary DLCI, and to switch
back to the primary a set time after the primary becomes operational again. These
automatic settings can be overridden via Frame Relay Backup Operations (
[B], [J]
from the Main Menu).
From the Frame Relay Backup Operations Menu:
●
To switch from a primary to one of its backups, press
[A]
.
●
To switch from a backup to a primary, press
[B]
.
In either case, enter (as prompted) the requested information to identify the primary
and backup.