Barco 26-0313000-00 Projector User Manual


 
84 Encore Presentation System • User’s Guide • Rev 04
3. Hardware Installation
Installation
táÇÉ=pÅêÉÉå=pí~Åâ=`çåÑáÖìê~íáçå
The figure below illustrates a block diagram of a wide screen “stack” configuration. Aux
destinations are not shown. Use this diagram for reference in the following procedure.
Figure 3-8. Block Diagram, Wide Screen Stack Configuration
For this procedure, you will need:
Projector #1 Projector #2
Program #1 Program #2
Preview #1 Preview #2
Ethernet Switch
To:
Routers
ScreenPRO-II
PresentationPRO-II
ImagePRO
Program Link
Source Link
Scaled Sources 7 - 12
Scaled Sources 1 - 6
Unscaled Sources
(Backgrounds) 3A, 3B
PG 2
PVW
PG 1
M/E Inputs VP #2 (ID #2)
VP #1 (ID #1)
PG 2 (DVI)
PVW (DVI)
Background (BG) Input 3B
Background (BG) Input 3A
Unscaled Srcs (DSK) 1A, 1B
Bottom
Stack
#1
Top
Stack
#1
PG 2
PVW
PG 1
M/E Inputs VP or VPx #4 (ID #4)
VP or VPx #3 (ID #3)
PG 2 (DVI)
PVW (DVI)
BG Input 3B
BG Input 3A
Bottom
Stack
#2
Top
Stack
#2
Program Link
Source Link
(Backgrounds)
3A, 3B
(DSK) 1A, 1B
Note: #1 is VP only
Note: #2 is VP only
Controller SC or LC
Table 3-7. Equipment List, Wide Screen Stack Configuration
Qty. Item Note
2 VP Master units (ID#1 and ID#2) must be VP, not VPx.
2 VP or VPx The ID of the bottom stack processor must always be lower than the ID
of the top stack processor. Use 6 total processors for triple wide
screen, use 8 for quadruple wide, etc.
1 Controller Model SC or LC
2 Video Projectors Customer supplied
4 DVI or Analog Monitors Program and Preview (customer supplied)