CTS 710 SONET Test Set User Manual
E–1
Appendix E: Incoming Inspection Test
The purpose of the incoming inspection test is to verify that the
CTS 710 SONET Test Set is functioning properly. The incoming
inspection test relies on the front panel status lights to indicate the
results of the test. Figure E–1 shows the location of the status lights
used in these procedures.
CLEAR HISTORY
button clears
history of events
Yellow history lights
indicate an event has
occurred
Red lights indicate an
event is occurring now
Green lights
indicate the
condition is true
Figure E–1: Front-Panel Status Lights
Table E–1 details the equipment required to complete the incoming
inspection test.
CTS 710 SONET Test Set User Manual
E–1
Appendix E: Incoming Inspection Test
The purpose of the incoming inspection test is to verify that the
CTS 710 SONET Test Set is functioning properly. The incoming
inspection test relies on the front panel status lights to indicate the
results of the test. Figure E–1 shows the location of the status lights
used in these procedures.
CLEAR HISTORY
button clears
history of events
Yellow history lights
indicate an event has
occurred
Red lights indicate an
event is occurring now
Green lights
indicate the
condition is true
Figure E–1: Front-Panel Status Lights
Table E–1 details the equipment required to complete the incoming
inspection test.