Preparing the Phone System 3-5
Octel 200/300 S.4.1PB60019−01
3.2 DETERMINING NECESSARY CHANGES
During the initial phase of the implementation process, perform a survey of the existing phone system.
From the descriptions of the application(s), decisions are made about how the Octel 200/300 should be
used. Refer to the Product Description volume, Implementation chapter, for a list of questions to ask
during the survey.
Use the results of the survey and the type of application to determine the necessary changes. Schedule
and track these changes using the checklist found in the Installation chapter, Testing the Installation and
Telephone Changes section.
For convenience, Public Exchange (PE) trunk changes are separate from PBX changes. The following
sections discuss changes that may be required and guidelines for ordering the changes for both PE
trunking and the PBX.