Installation 4−3
PB60019−01 Octel 200/300 S.4.1
Moving the Equipment On-Site
Before moving the server, verify the status of the new site:
- Is the input power ready?
- Is it the same as the input power required for the Octel 200/300?
- Is the installation location ready?
- Are the telephone extensions ready to be hooked up?
Move the Octel 200/300 server in the vertical, upright position on the shipping pallet. Be careful and
always remember that the Octel 200/300 is delicate electronic equipment.