1-32 Installation and Maintenance Volume
Octel 200/300 S.4.1 PB60019−01
The following questions appear the same as in a regular installation.
5. NETWORK LOCATIONS.
6. NETWORK NUMBERING PLAN.
7. DISTRIBUTION LISTS.
Table PRE−LOADED from disk. UPDATE if necessary when INSTALL
is complete.
8. COS.
Table PRE−LOADED from disk. UPDATE if necessary when INSTALL
is complete.
9. INFORMATION TABLES.
Table PRE−LOADED from disk. UPDATE if necessary when INSTALL
is complete.
10. SCHEDULE TABLES.
Table PRE−LOADED from disk. UPDATE if necessary when INSTALL
is complete.
Continue with the questions as shown in INSTALL, until this message appears:
WARNING: FOR PROPER OPERATION SYSTEM MUST BE RESTARTED AFTER INSTALL!
INSTALL COMPLETE.
WAIT...DONE.
SAVE configuration to a DISKETTE? (Y/N, empty line = N).
:Y
DAY MM/DD HH:MM:SS YYYY SYSTEM NAME ID:000000 S/N:000000 PBX:00
−−−−−−−−−− SYSTEM INSTALLATION COMPLETED −−−−−−−
For correct operation, you must reload the Octel 200/300 after INSTALL. At the @ prompt, type:
RESTA 2
Enter