Access Navigator - Release 1.8 August 2003 6-13
Electrical Installation
Connect DSX-1 Cables to Access Navigator
Attach Ferrite Beads
WARNING! NEBS REQUIREMENT. DO NOT CONNECT THIS EQUIPMENT DIRECTLY
TO METALLIC TIP-AND-RING OUTSIDE PLANT CONDUCTORS. THIS EQUIPMENT CAN ONLY
BE USED FOR INTRA-BUILDING (INSIDE PLANT) INSTALLATION IN A CENTRAL OFFICE OR
CUSTOMER PREMISES.
1. Obtain two ferrite beads to attach each DSX-1 cable (see Figure 6-6).
2. Position ferrite beads for most convenient cable dressing and wire tying (see example in Figure
6-6). Location is not critical.
3. Open the snap-on ferrite beads along hinge cover (see Figure 6-6, Detail A).
4. Fold ferrite bead hinge covers together over DSX-1 cables. Press covers together until they snap
together.
Figure 6-6. Attaching Ferrite Bead RF Suppressors
Detail A
Ferrite
Beads
Ferrite
Beads
Wire
Tie
DSX-1 Cable
Connectors