Carrier Access Access Navigator Network Router User Manual


 
12-6 August 2003 Access Navigator - Release 1.8
Provision Remote Adit 600 via FDL
Obtain Provisioning Information
Obtain Provisioning Information
1. Obtain office records for installation site.
2. Obtain circuit orders for remote Adit 600 service turn up.
Verify Equipment Configuration
CAUTION! VERIFY CURRENT CONFIGURATION AND SERVICE STATUS WITH OFFICE
RECORDS BEFORE ADDING, DELETING, OR CHANGING CIRCUITS.
NOTE: The factory default sets all DS1s and DS0s in-service (up). To prevent
inadvertent service disruptions, it is good practice to set circuits out of service (down) when
not in use or not provisioned in the switch. Set the type of unused DS0 channels to match
the DS0 type configured on the device at the other end of the DS1. If the DS1 is not
terminated, set the type to data.
NOTE: For remote FDL provisioning, the Adit 600 must be set to ESF framing, B8ZS
line code, and ANSI T1.403 FDL protocol. (These are the default settings.)
1. Start management session (see Start Management Session on page 7-1).
2. Verify number of DS1 circuits installed by comparing equipment status with office records with the
following command:
status equipment
A message similar to the following will appear, showing the equipment card slots, service status,
and Controller software version.
Equipment Status Version
--------- ------ -------
Controller A Standby 01.70 GR-303 Option
Controller B Active 01.70 GR-303 Option
DS1 Card 1 Installed 1
DS1 Card 2 Installed 1
DS1 Card 3 Installed 1
DS1 Card 4 Installed 1
DS1 Card 5 Installed 1
DS1 Card 6 Installed 1
DS1 Card 7 Installed 1
DS1 Card 8 Installed 1
3. Verify number of DS1 circuits installed by comparing equipment status with office records. If there
is a discrepancy, follow standard practices to resolve problem.