HP (Hewlett-Packard) 200 Network Router User Manual


 
LQM negotiation rejected by remote station
Meaning: For the indicated PPP circuit, the remote station refuses to accept
negotiation of the Link Quality Monitor (LQM) parameter. The system
cannot bring up the Link Control Protocol (LCP) until the remote station
is willing to accept negotiation of the LQM parameter.
Action: If it is not considered necessary to receive Link Quality Report (LQR)
packets in order to monitor link quality, then modify the configuration
so that the LQM Time parameter is set to 0. If the LQM Time parameter
is set to 0, then the system will not require the peer (remote) station to
send LQR packets.
Management Interface connection established
Meaning: The network and the DTE hav eestablished the connection necessary for
periodic polling and status message exchange on the identified circuit.
mapped inact used since req q’ed. cct=
YYY
Meaning: This indicates that an IP-mapped circuit has timed out due to inactivity
on circuit YYY. The inactivity time set in the map record was used since
other requests were queued waiting a free circuit.
Max Pkt Size adjusted down to 1500
Meaning: For the indicated PPP circuit, the Max Pkt Size parameter exceeded the
maximum value allowed of 1500 bytes. The Max Pkt Size parameter has
been automatically adjusted down to 1500 bytes.
Action: Modify the configuration so that the Max Pkt Size parameter is within
the legal range.
Memory error (MERR) detected
Meaning: The LAN controller or link level controller cannot access the router
memory. The circuit is effectively disabled.
Action: Verify hardware integrity.
Event Log Messages
cct: Circuit Event Messages
17-36