3-86 C122-E003-02EN
MMB
CHAPTER 3 Web-UI Operations
Table 3.55 Buttons in the [Add/Edit Schedule] window
(1) Menu operation
[Partition] → [Schedule] → [Schedule List] → [Add]/[Edit]
(2) GUI operation
1 For the schedule to be set, select a partition from the pulldown list.
2 Select a schedule type by clicking a radio button, specify values in [Pattern],
[Term], [On Time], and [Off Time], and click the [Apply] button.
The specified values for the schedule items of the partition are then set.
Term Depending on the schedule type and pattern, specify the months or
dates of this period.
On Time Specify whether the power-on processing is performed on a
scheduled day of operation. For power-on processing, specify the
power-on time of the partition. The setting range for the hour is 24
or less, and the setting range for the minutes is 00, 10, 20, 30, 40,
or 50.
Off Time Specify whether the power-off processing is performed on a
scheduled day of operation. For power-off processing, specify the
power-off time of the partition. The setting range for the hour is 24
or less, and the setting range for the minutes is 00, 10, 20, 30, 40,
or 50.
Button Description
Apply Sets the specified values for the schedule items of the partition.
Cancel Reverts to the original settings in the schedule items.
Item Description