Lucent Technologies lucent Server User Manual


  Open as PDF
of 2392
 
DEFINITY Enterprise Communications Server Release 6
Maintenance for R6vs/si
555-230-127
Issue 1
August 1997
Maintenance Object Repair Procedures
Page 10-399DID-DS1 (DS1 DID Trunk)
10
instructed to listen to several different tones and conference the tones together.
The resulting signal is then measured by a Tone Detector port. If the level of the
tone is within a certain range, the test passed.
Table 10-130. TEST #7 Conference Circuit Test
Error
Code
Test
Result Description/ Recommendation
ABORT Could not allocate the necessary system resources to run this test.
1. Retry the command at one-minute intervals a maximum of five times.
2. If the test continues to abort, escalate the problem.
1000 ABORT System resources required to run this test were not available. The port may
be busy with a valid call. Use the display port PCSSpp command to
determine the trunk group/member number of the port. Use the status trunk
command to determine the service state of the port. If the service state
indicates that the port is in use, then the port is unavailable for certain tests.
You must wait until the port is idle before retesting.
1. If the port status is active but the port is not in use (no calls), check the
error log for error type 1025 (see the Error Log table for a description of
this error and required actions). The port may be locked up.
2. If the port status is idle, retry the command at 1 minute intervals for a
maximum of 5 times.
3. If the test continues to abort, escalate the problem.
1002 ABORT The system could not allocate time slots for the test. The system may be
under heavy traffic conditions, or it may have time slots out of service due to
TDM-BUS errors. Refer to the TDM-BUS (TDM bus) Maintenance
documentation to diagnose any active TDM-BUS errors.
1. If the system has no TDM-BUS errors and is not handling heavy traffic
and the port status is idle, retry the command at 1 minute intervals for a
maximum of 5 times.
2. If the test continues to abort, escalate the problem.
1003 ABORT The system could not allocate a tone receiver for the test. The system may be
oversized for the number of tone detectors present or some of the tone
detectors may be out of service. Issue the list measurements tone-receiver
command to display basic information about the system’s tone receivers.
1. Look for TTR-LEV errors in the error log. If present, refer to the TTR-LEV
Maintenance documentation.
2. Look for TONE-PT errors in the error log. If present, refer to the TONE-PT
Maintenance documentation.
3. If neither condition exists, retry the test at 1 minute intervals for a
maximum of 5 times.
4. If the test continues to abort, escalate the problem.
Continued on next page