Lucent Technologies lucent Server User Manual


  Open as PDF
of 2392
 
DEFINITY Enterprise Communications Server Release 6
Maintenance for R6vs/si
555-230-127
Issue 1
August 1997
Maintenance Object Repair Procedures
Page 10-201BRI-SET, ASAI-ADJ, BRI-DAT
10
BRI Layer 3 Query Test (#629)
This test is used to check the application layer communications between the
switch and the endpoint or adjunct.
For BRI endpoints, an application message containing the appropriate endpoint
service state is sent by the switch to the endpoint. The endpoint responds with an
acknowledgment to the application message.
For ASAI and AT&T adjuncts, this test is not executed from the administration
terminal. Rather, a query message is automatically sent by the switch every two
minutes. Failure of the switch to receive a response to a query from the adjunct is
logged in the Hardware Error Log.
2000 FAIL The XID-RESPONSE message was not received from the endpoint.
1. Consult the endpoint documentation to determine if the Layer 2 XID
and XID-RESPONSE messages are supported. If the documentation
reflects no support for these messages, change XID Testing? field to
"no" using the change station extension command.
2. If the endpoint supports these Layer 2 messages and the test
continues to fail, assume the endpoint is defective and replace it.
3. If the test continues to fail, escalate the problem.
PASS The switch can successfully pass messages over the D-channel to the BRI
endpoint.
Table 10-72. TEST #629 BRI Layer 3 Query
Error
Code
Test
Result Description/ Recommendation
1005 ABORT The endpoint’s MIMs Supported? field is administered to "no."
1. Use the change station extension command to change
the parameter only if the endpoint documentation reflects
support for ISDN-BRI Management and Maintenance
Procedures.
Continued on next page
Table 10-71. TEST #628 BRI XID — Continued
Error
Code
Test
Result Description/ Recommendation
Continued on next page