Lucent Technologies lucent Server User Manual


  Open as PDF
of 2392
 
DEFINITY Enterprise Communications Server Release 6
Maintenance for R6vs/si
555-230-127
Issue 1
August 1997
Maintenance Commands and Trouble-Clearing Aids
Page 8-384test shadow-link
8
Output
The following output example is for the test shadow-link command. The
responses display on a test-by-test basis with one line of data for each test result.
1. If no alarms are registered against the maintenance object then the test sequence is run only once. The
long
clear
option forces a clear of all alarms if no errors are encountered during testing. The
short clear
option only
clears alarms pertinent to tests in the short sequence.
2. Refer to the Report Scheduler and System Printer feature specification for more details.
Action/Objec
t Qualifier Qualifier Description Permissions Defaults
Feature
Interactions
test
shadow-link
short |
long
repeat
number
clear
schedule
Both the short and long test
sequence execute only Test #318.
How many times each test in the
sequence is repeated (1-100)
This option causes the test
sequence (short or long) to repeat
until the alarm (if any) is cleared or
a single test in the sequence fails.
1
Command is validated and then a
scheduling form displays to
schedule execution of the
command. The command is then
placed in the command queue and
is executed at the specified time.
The information displayed by the
command is sent to the system
printer instead of the screen.
2
Examples:
test shadow-link l
test shadow-link sh r 2
test shadow-link sh r 2 schedule
test shadow-link c
init
inads
craft
Test
Sequence
= short;
Repeat = 1
none
test shadow-link
TEST RESULTS
Port Maintenance Name Alt. Name Test No. Result Error Code
SHDW-LNK 318 PASS
Command Successfully Completed