DEFINITY Enterprise Communications Server Release 6
Maintenance for R6vs/si
555-230-127
Issue 1
August 1997
Maintenance Commands and Trouble-Clearing Aids
Page 8-362test maintenance
8
Output
The following example shows the output for the test link 1 long command. The
responses display on a test-by-test basis with one line of data for each test result.
Field descriptions
test maintenance
This command tests the EPN maintenance circuit pack in any Expansion Port
Network control carrier. Specifying cabinets 2 - 3 allows testing of any connected
EPN maintenance circuit packs. The test sequence checks the SAT interface, EI
Port Port address on the Processor Interface board associated with
the link-id being tested.
Maintenance
Name
The name of maintenance object being tested
Alt. Name Not applicable.
Test No The test being executed
Result Test result: Pass, Abort, Fail, No Board, Disabled, Extra Bd.
Error Code Numeric code explaining why the release failed or aborted. Refer
to the detailed list of the codes by test number for each MO.
test link 1 long
TEST RESULTS
Port Maintenance Name Alt. Name Test No. Result Error Code
01AXX01 PI-LINK 182 PASS
01AXX01 PI-LINK 183 PASS
01AXX01 PI-LINK 234 PASS
01AXX01 PI-LINK 233 PASS
Command Successfully Completed