Lucent Technologies lucent Server User Manual


  Open as PDF
of 2392
 
DEFINITY Enterprise Communications Server Release 6
Maintenance for R6vs/si
555-230-127
Issue 1
August 1997
Maintenance Object Repair Procedures
Page 10-1037PR-MAINT (Maintenance Processor [TN790 RISC Systems])
10
Notes:
a. Refer to PROCR (TN790 RISC Processor) for a description of these tests.
b. Refer to PR-MEM (TN790 RISC Memory) for a description of these tests.
c. This test is run only on the standby SPE in a high or critical reliability
system. On other systems or on the Active SPE, the test is run only via a
reset system 4 command or a reset system 5 command.
d. This test only runs on the active SPE.
e. This test aborts if an external modem is not administered.
1. D = Destructive; ND = Nondestructive
Order of Investigation
Short Test
Sequence
Long Test
Sequence D/ND
1
Processor Cache Test (#895)(a) X ND
Processor Cache Audit (#896)(a) X X ND
Processor Bus Time-out Exception Test (#82)(a) X X ND
Processor BOOTPROM Checksum Test (#80)(a) X X ND
Processor Write Buffer Test (#900)(a) X X ND
Memory Burst Read Test (#908)(a) X X ND
Read All Memory Test (#85)(a) X ND
Memory Parity Error Detection Test (#87)(a) X X ND
Flash Memory Checksum Test (#86)(a) X ND
Memory Functional Test (#332) (b)(c) X D
MTP Outpulse Relay Test (#102)(d) X X ND
External Modem Present Test (#230)(d)(e) X X ND
MTP Analog Loop Around Test (#103)(d) X X ND
MTP Sanity Handshake Test (#106) X X ND
MTP SAT Loop Around Test (#228) X X ND
MTP Aux Loop Around Test (#229) X X ND
MTP Reset Test (#101) X D
MTP Dual Port Ram Test (#104)(d) X D
Continued on next page