Lucent Technologies lucent Server User Manual


  Open as PDF
of 2392
 
DEFINITY Enterprise Communications Server Release 6
Maintenance for R6vs/si
555-230-127
Issue 1
August 1997
Maintenance Object Repair Procedures
Page 10-104ANN-BD (Announcement Circuit Pack)
10
FAIL
(cont’d.)
3. If this is a Standard system (that is, not a High or Critical Reliability
system), replace the ANN-BD. Rerun the test. If the test continues to
fail, replace the Tone-Clock circuit pack located in the same Port
Network as the ANN-BD.
!
WARNING:
Replacing the Tone-Clock circuit pack causes a standard system
PPN to perform a COLD 2 reset or an EPN to reset. See the "How to
Replace a Tone-Clock Circuit Pack" section in the "TONE-BD
(Tone-Clock Circuit Pack)" Maintenance documentation. Replacing
the ANN-BD results in loss of integrated announcements. See
"General Notes" near the beginning of this Maintenance procedure.
4. If there are recurring alarms on this circuit pack caused by this test
failing, replace the ANN-BD even if the previous steps were
successful.
!
WARNING:
Replacing the TONE-BD causes a standard system PPN to perform
a COLD 2 reset or an EPN to reset. Replacing the ANN-BD results in
loss of integrated announcements. See the "General Notes" section
near the beginning of this Maintenance procedure.
PASS Announcement record/playbacks should have clear sound quality.
User-reported troubles on this circuit pack should be investigated using
other circuit packs and port tests. Refer to "ANN-PT (Announcement Port)"
Maintenance documentation for a description of the port tests.
Table 10-38. TEST #212 Clock Match Inquiry Test — Continued
Error
Code
Test
Result Description/ Recommendation
Continued on next page