Maintenance Object Repair Procedures
Page 10-186BRI-SET, ASAI-ADJ, BRI-DAT
10
0 Unrecognized
ASAIProtocol
Operation
Requested ASAI protocol operation is not
implemented by the switch or adjunct. Aux Data
field of Error Log entry contains protocol identifier
for unrecognized operation.
1. Consult switch and adjunct documentation to
determine which set of operations is supported
by the switch and the adjunct. Adjunct
administration turning off operations not
implemented by the switch may resolve the
problem.
2. If Step 1 does not resolve the problem,
escalate to the next tier.
40 Resources not
available
No available internal resources to service switch or
adjunct request. System transaction capacity for
adjunct or switch is exceeded.
1. Re-engineering of adjunct services my be
required. If problem persists, escalate problem
to the next tier.
63 Service or Option
Not Available
Requested ASAI capability or resource is not
available on the switch or adjunct. More than one
adjunct may be contending for the same switch
resources. Potential administration mismatch
between the resource domains administered on
the switch and those administered on the adjunct.
1. Verify that no overlapping administration of
switch resources (e.g., requesting notifications
on a single domain by multiple adjuncts or
multiple adjuncts attempting to control a single
call) exists across all adjuncts connected to
the switch. If overlaps exist, then readminister
the adjuncts to guarantee that each adjunct is
associated with a unique set of switch
resources.
2. If Step 1 does not resolve the problem,
escalate to the next tier.
Table 10-66. ASAI Cause Values — Continued
Code Explanation Recommendation