DEFINITY Enterprise Communications Server Release 6
Maintenance for R6vs/si
555-230-127
Issue 1
August 1997
Maintenance Object Repair Procedures
Page 10-193BRI-SET, ASAI-ADJ, BRI-DAT
10
For all endpoint types, a signaling link becomes "unbound" when it is
disconnected at Layer 2. For BRI endpoints supporting MIM initialization, a
signaling link may also become "unbound" if a subsequent attempt to perform
SPID initialization on a "bound" link fails, (that is, wrong SPID is entered into the
endpoint by the user).
Table 10-69. TEST #626 Signaling Link Status Test
Error
Code
Test
Result Description/ Recommendation
1139 ABORT The Packet Bus in the port network is out-of-service.
1. Follow the repair procedures for the Packet Bus.
2. After completing Step 1, execute the test port long PCSSpp
command, and review the results of the BRI Port Local LAN Loop
Around Test to verify the repair.
1141 ABORT The PKT-CTRL is out-of-service.
1. Refer to PKT-CTRL (Packet Control Circuit Pack) Maintenance
documentation.
2. If Step 1 does not resolve the problem, escalate to the next tier.
1144 ABORT The PPN Packet Bus is out-of-service.
1. Follow the repair procedures for the Packet Bus in the PPN.
2. After completing Step 1, execute the test port long PCSSpp
command, and review the results of the BRI Port Local LAN Loop
Around Test to verify the repair.
Continued on next page