Maintenance Object Repair Procedures
Page 10-1558XXX-BD (Common Port Circuit Pack)
10
System Technician-Demanded Tests:
Descriptions and Error Codes
Always investigate tests in the order presented in the table below when
inspecting errors in the system. By clearing error codes associated with the
Control Channel Loop Around Test
, for example, you may also clear errors
generated from other tests in the testing sequence.
a. Only applicable to Analog Line circuit packs.
b. Only applicable to TN746 and TN769 Analog Line circuit packs.
NPE Audit Test (#50)
The system sends a message to the on-board microprocessor to update the
network connectivity translation for all the Network Processing Elements (NPEs)
on the circuit pack.
1. D = Destructive; ND = Nondestructive
Order of Investigation
Short Test
Sequence
Long Test
Sequence
Reset Board
Sequence D/ND
1
NPE Audit Test (#50) X ND
Ringing Application Test (#51) (a) X X ND
Control Channel Loop Around Test (#52) X X ND
SAKI Sanity Test (#53) X D
Neon Test (#220) (b) X X ND
Table 10-526. TEST #50 NPE Audit Test
Error
Code Test Result Description/ Recommendation
none or
2100
ABORT System resources required for this test are not available.
1019 ABORT Test already in progress.
FAIL Internal System Error.
1. Retry the command at one-minute intervals a maximum of five
times.
2. If the test continues to abort, escalate the problem.
PASS The circuit pack’s NPEs have been updated with their translation.