Lucent Technologies lucent Server User Manual


  Open as PDF
of 2392
 
DEFINITY Enterprise Communications Server Release 6
Maintenance for R6vs/si
555-230-127
Issue 1
August 1997
Maintenance Object Repair Procedures
Page 10-716ISDN-PLK (ISDN-PRI Signaling Link Port)
10
Figure 10-39. Signaling Port Packet Bus (LAN) Loopback
Table 10-240. TEST #939 Signaling Port Packet Bus Loopback
Error
Code
Test
Result Description/ Recommendation
1015 ABORT The port is not in the out-of-service state. Use the busyout port PCSSpp
command to place it in the out-of-service state and repeat this test
!
CAUTION:
The busyout will prevent new call originations on all B-channels in
the signaling group until the port is released.
1139 ABORT The Packet Bus in this port network is out of service.
1. Follow repair procedures for the Packet Bus
2. Enter test port PCSSpp long and check the results of this test (939).
1141 ABORT The Packet Control circuit pack is out of service.
1. Follow the repair procedures for PKT-CTRL.
2. Enter test port PCSSpp long and check the results of this test (939).
1144 ABORT The Packet Bus in the PPN is out of service.
1. Follow the repair procedures for the Packet Bus.
2. Enter test port PCSSpp long and check the results of this test (939).
2012
2100
ABORT
ABORT
Internal system error
Could not allocate the necessary system resources to run this test
1. Retry the command at 1-minute intervals a maximum of 5 times.
Continued on next page
Packet Bus
To far end
switch hardware
Processor
(TN786)
Packet
Control
Circuit
Pack
(TN778)
UDS1
Interface
Circuit
Pack
(TN464*)
*TN464 C or later