Lucent Technologies lucent Server User Manual


  Open as PDF
of 2392
 
DEFINITY Enterprise Communications Server Release 6
Maintenance for R6vs/si
555-230-127
Issue 1
August 1997
Maintenance Commands and Trouble-Clearing Aids
Page 8-290status pms-link
8
status pms-link
This command displays the status of the property management system interface
link. If the link is up, whether or not a data base swap is taking place between the
switch and the property management system (PMS), is displayed. If the link is
down, the number of times the switch has tried to set up the link is displayed.
A PMS is a standalone computer system that can be integrated with the switch to
enhance the service capability for a hotel/motel.
For general information on PMS links, see the description of the ‘‘
busyout
pms-link’’.
Local Busy Out
Informational only. No action is necessary. It is one of
eight counters that tells the link’s down history since the
last clear link command.
Firmware Initiated Link
Down
Informational only. No action is necessary. It is one of
eight counters that tells the link’s down history since the
last clear link command. Please consult SCI-BD or
PROTOCOL errors to determine the cause.
LOCAL/REMOTE PROCESSOR
CHANNELS
Local/remote processor channel pairs. Each pair
consists of a processor channel on the local machine
and a processor channel on the remote machine that is
connected in the communication session.
NOTE:
For “ISDN-LNK” links, no correlation between the
local and remote processor channels exists.
Therefore, only the local processor channel is
shown (the remote processor channel is blank).
Action/
Object Qualifier Qualifier Description Permissions Defaults
Feature
Interactions
status
pms-link
print
Report sent to printer
Examples:
status pms-link
status pms-link print
init
inads
craft
cust
browse
none none