Lucent Technologies lucent Server User Manual


  Open as PDF
of 2392
 
DEFINITY Enterprise Communications Server Release 6
Maintenance for R6vs/si
555-230-127
Issue 1
August 1997
Maintenance Object Repair Procedures
Page 10-1228SYS-PRNT (System Printer)
10
Link Tear Down Test (#213)
This test is destructive.
The Link Tear Down Test disconnects the existing link between DEFINITY
Generic 1 and the external SYS-PRNT output device. If the link has been
disconnected already, this test just returns PASS. All resources allocated for a
System Printer Link are released after this test.
Link Retry Test (#215)
The Link Retry Test sends a message to the SYS-PRNT software process either
(1) to make a data call to the extension to which the SYS-PRNT output device
connects OR (2) to open the EIA port to the SYS-PRNT output device. If the
System Printer Link is already up, this test passes without making a data call or
opening the EIA port.
Table 10-423. TEST #213 Link Tear Down Test
Error
Code
Test
Result Description/ Recommendation
40, 50 ABORT Internal system error
1. Retry the command at 1-minute intervals a maximum of 2 times.
1010 ABORT The System Printer Link has been busied out.
1. Enter the release sp-link command to release the System Printer Link
from the busyout state.
2. Reissue the test sp-link long command to execute the test.
FAIL Internal system error
1. Retry the command at 1-minute intervals a maximum of 2 times.
PASS The System Printer Link is torn down or a Short Test Sequence was
executed and the link was not torn down.
Continued on next page
Table 10-424. TEST #215 Link Retry Test
Error
Code
Test
Result Description/ Recommendation
10, 20 ABORT Internal system error
1. Retry the command at 1-minute intervals a maximum of 2 times.
Continued on next page