Lucent Technologies lucent Server User Manual


  Open as PDF
of 2392
 
DEFINITY Enterprise Communications Server Release 6
Maintenance for R6vs/si
555-230-127
Issue 1
August 1997
Maintenance Commands and Trouble-Clearing Aids
Page 8-232status bri-port
8
BRI
(cont’d)
0-126 L3-Assigned ext yes Transitory state for BRI endpoints
which support MIM initialization
when SPID Facility Test initializes
the station.
5. Wait for five seconds and
repeat the command. If the
state has not changed, continue
with Step 2.
6. Make sure SPID administration
on the switch and endpoints are
consistent. Verify the repair by
executing the status bri-port
PCSSpp command. Determine
that the L2 state of the signaling
link is L3-Established.
Otherwise, go to Step 3.
7. Try to replace the endpoint.
Verify the repair by executing
the status bri-port PCSSpp
command. Determine that the
L2 state of the signaling link is
L3-Established.
ASAI 0-126 Hyperactive ignore ignore Link has sent too many messages
per unit time.
BRI Signaling suspends. System
timeouts in 60 seconds and
attempts reactivate the link. If links
remain in this state while no activity
occurs at BRI endpoints:
1. Ensure that SPID switch
administration and endpoints
are consistent. Verify repairs by
executing the status bri-port
PCSSpp command. Determine
that the L2 state of the signaling
link is L3-Established.
2. Replace the endpoint. Verify
repairs by executing the status
bri-port PCSSpp command.
Determine that the L2 state of
the signaling link is
L3-Established.
Table 8-3. Status BRI-Port Command Interpretation — Continued
Endpoint
Types
TEI
Range Layer 2 State
Voice
Extension
Service
SPID Description / Recommendation
Continued on next page