Lucent Technologies lucent Server User Manual


  Open as PDF
of 2392
 
DEFINITY Enterprise Communications Server Release 6
Maintenance for R6vs/si
555-230-127
Issue 1
August 1997
Maintenance Commands and Trouble-Clearing Aids
Page 8-354test interface
8
test interface
This command performs hardware diagnostic tests on the specified processor
interface circuit pack. In addition to testing the PI board, the tests examine the
protocol and link interface that is transmitted over the board.
!
WARNING:
Since the “clear long” options clear all counters if tests pass, it is possible
for firmware counters to be cleared even when a problem exists. In some
cases customer service might degrade since calls may be routed over
defective equipment.
1. If no alarms are registered against the maintenance object then the test sequence is run only once. The
long
clear
option forces a clear of all alarms if no errors are encountered during testing. The
short clear
option only
clears alarms pertinent to tests in the short sequence. SEE WARNING BELOW.
2. Refer to the Report Scheduler and System Printer feature specification for more details.
Action/Object Qualifier Qualifier Description Permissions Defaults
Feature
Interactions
test interface location
short
long
repeat
number
clear
schedule
Location (cabinet-carrier-position)
of the processor interface (position
1 = first processor interface in the
carrier, 2 = second)
Option for a brief series of
nondestructive diagnostic tests.
Option for a longer, more
comprehensive series of both
destructive and nondestructive
diagnostic tests.
Number of times each test in the
sequence is repeated (1-100)
This option causes the test
sequence (short or long) to repeat
until the alarm (if any) is cleared or
a single test in the sequence fails.
1
Command is validated and then a
scheduling form displays to
schedule execution of the
command. The command is then
placed in the command queue and
is executed at the specified time.
The information displayed by the
command is sent to the system
printer instead of the screen.
2
Examples:
test interface 01a1 l
test interface 01b2 s r 2
test interface 01b2 s r 2 schedule
test interface b1 l r 25
test interface a2
init
inads
craft
nms
Test
sequence
= short;
repeat = 1
none