Lucent Technologies lucent Server User Manual


  Open as PDF
of 2392
 
DEFINITY Enterprise Communications Server Release 6
Maintenance for R6vs/si
555-230-127
Issue 1
August 1997
Maintenance Commands and Trouble-Clearing Aids
Page 8-183release sp-link
8
with the far-end PRI terminal adapter activating PRI endpoint port (B-channel).
Maintenance does background initialization testing on released ports. For details
of the test sequence, refer to [3].
Output
The following output example is a display of the release pri-endpoint 22501
command. Assume that the PRI endpoint ports for extension 22501 are in cabinet
1, carrier B, slot 20, circuit 1 to 6.
Field descriptions
release sp-link
The release sp-link command reactivates busied out system printer links and
resolves active alarms for system printer links.
Action/Object Qualifier Qualifier Description Permissions Defaults
Feature
Interactions
release
pri-endpoint
extension
extension number associated with
desired PRI endpoint.
init
inads
craft
nms
none none
Port
Port address (cabinet-carrier-slot-circuit) of released maintenance object.
Maintenance Name
PE-BCHL.
Alt. Name
Alternate way to identify maintenance objects. (PRI endpoint extension)
Result
Success status of a busied out object (PASS, ABORT, FAIL)
Error Code
System-generated description of a command failure.
release pri-endpoint 22501 page 1 of 1
COMMAND RESULTS
Port Maintenance Name Alt. Name Result Error Code
01B2001 PE-BCHL 22501 PASS
01B2002 PE-BCHL 22501 PASS
01B2003 PE-BCHL 22501 PASS
01B2004 PE-BCHL 22501 PASS
01B2005 PE-BCHL 22501 PASS
01B2006 PE-BCHL 22501 PASS
Command Successfully Completed