Lucent Technologies lucent Server User Manual


  Open as PDF
of 2392
 
DEFINITY Enterprise Communications Server Release 6
Maintenance for R6vs/si
555-230-127
Issue 1
August 1997
Maintenance Object Repair Procedures
Page 10-798MEM-BD (Memory)
10
c. This test is run only on the Standby SPE in a High or Critical Reliability
system. On other systems or on the Active SPE, the test is run only via a
reset system 4 command or a reset system 5 command.
Read All Memory Test (#85)
This test is a nondestructive test. The test reads every memory location in
memory and writes it back. A failure of this test indicates a failure in the
Processor or Memory circuit pack.
Text Checksum Test (#86)
This test is a nondestructive test. The test computes the checksum of the
DEFINITY software text module, and it validates the operation of the flash ROM. A
failure of this test indicates corruption of the Text.
Table 10-268. TEST #85 Read All Memory Test
Error
Code
Test
Result Description/Recommendation
1029
2014
2015
2016
2017
2018
2020
2022
2024
2025
2051
ABORT Refer to STBY-SPE Maintenance documentation for a description of these
error codes.
1 FAIL If the system can still provide service, this indicates that the Processor
circuit pack or Memory has a problem, but can still function. The error code
"1" indicates that MEM-BD 1 is failing the test.
1. Replace the PROCR (Processor circuit pack).
!
WARNING:
If the Processor circuit pack must be replaced, and if there is a blank
in the Expansion Memory circuit pack slot (that is, in the slot
immediately to the right of the Processor circuit pack), remove the
blank before removing the circuit pack. Otherwise, the circuit pack
and/or the two connectors that are used to connect the Expansion
Memory circuit pack (if available) might become damaged.
PASS The Memory is healthy.
Continued on next page