DEFINITY Enterprise Communications Server Release 6
Maintenance for R6vs/si
555-230-127
Issue 1
August 1997
Maintenance Object Repair Procedures
Page 10-810MET-LINE (MET Line)
10
Port Diagnostic Test (#35)
This test checks a port’s battery feed circuitry. The battery feed circuitry is tested
for proper battery voltage by testing the switchhook state. In response to the test
message, the on-board firmware terminates the line and checks for switch-hook
presence. The termination is then removed, and a check is made for no
switch-hook presence. The MET set must be on-hook for the test to execute.
Any FAIL This test can fail due to on-board or off-board problems. Off-board
problems of concern include EXP-INTF faults, TDM-BUS faults, and faults
associated with the tone detectors/tone generators. Clear all off-board
problems before replacing the board. Keep in mind that a TDM-BUS
problem is usually the result of a faulty board connected to the backplane
or bent pins on the backplane.
1. Look for EXP-INTF errors in the error log. If present, refer to the
EXP-INTF Maintenance documentation.
2. Look for TDM-BUS errors in the error log. If present, refer to the
TDM-BUS Maintenance documentation.
3. Look for TONE-BD and/or TONE-PT errors in the error log. If present,
refer to the TONE-BD Maintenance documentation and the TONE-PT
Maintenance documentation.
4. Test the board when the faults from steps 1, 2, and 3 are cleared.
Replace the board only if the test fails.
PASS The port is correctly using its allocated time slots. User-reported troubles
on this port should be investigated using other port tests and examining
station, trunk, or external wiring.
0NO
BOARD
The test could not relate the internal ID to the port (no board). This could
be due to incorrect translations, no board is inserted, an incorrect board is
inserted, or an insane board is inserted.
1. Check to ensure that the board translations are correct. Use the list
config command, and resolve any problems that are found.
2. If the board was found to be correctly inserted in step 1, issue the
busyout board command.
3. Issue the reset board command.
4. Issue the release busy board command.
5. Issue the test board long command. This should re-establish the
linkage between the internal ID and the port. If this is not the case,
check to ensure that there is a valid board inserted.
Table 10-271. TEST #6 NPE Crosstalk Test — Continued
Error
Code
Test
Result Description/ Recommendation
Continued on next page