Maintenance Object Repair Procedures
Page 10-820MET-LINE (MET Line)
10
MET Line Station Lamp Updates Test (#60)
For this test, the software lights the lamps on the terminal based on the status
record contained in the processor. The lamp updates run only if the station is
in-service.
0NO
BOARD
The test could not relate the internal ID to the port (no board). This
could be due to incorrect translations, no board is inserted, an
incorrect board is inserted, or an insane board is inserted.
1. Check to ensure that the board translations are correct. Use the
list config command, and resolve any problems that are found.
2. If the board was found to be correctly inserted in step 1, issue the
busyout board command.
3. Issue the reset board command.
4. Issue the release busy board command.
5. Issue the test board long command. This should re-establish the
linkage between the internal ID and the port. If this is not the case,
check to ensure that there is a valid board inserted.
Table 10-275. TEST #60 MET Line Station Lamp Updates Test
Error
Code
Test
Result Description/ Recommendation
1 ABORT This port may have been busied out by system technician.
1. Look in the Error Log for Error Type 18 (port busied out) for this
port. If this error type is present, then release the port via the
release station <extension> command and run the test again.
2. Make sure that the terminal is connected.
3. Retry the command at one-minute intervals a maximum of five
times.
4. If the test continues to abort, escalate the problem.
Continued on next page
Table 10-274. TEST #57 MET Circuit and Conference Circuit Test — Continued
Error
Code
Test
Result Description/ Recommendation
Continued on next page