DEFINITY Enterprise Communications Server Release 6
Maintenance for R6vs/si
555-230-127
Issue 1
August 1997
Maintenance Object Repair Procedures
Page 10-934PE-BCHL (PRI Endpoint Port)
10
Signaling
link has
been down
for over 90
seconds?
X
Warn
Alarm
See ISDN-SGRP,
ISDN-LNK, PI-LINK
and/or SYS-LINK and
follow repair
procedures.
Is far-end terminal
adapter currently
restarting?
Repeated
failure of
far-end to
respond to
messaging?
X
Warn
Alarm
Periodically
Maintenance will try to
resend messages. To
speed process, run
system
technician-demanded
test test port
PCSSpp (Test #256).
Far-end
port busied
out
(OOS/FE).
Far-end
port being
tested
(MTCE/FE).
X
Warn
Alarm
X
Warn
Alarm
Check status of
far-end terminal
adapter.
Table 10-311. PRI Endpoint Port Service States — Continued
Possible
Problem
Source
O/S-NE
O/S-FE
O/S- FE Pend- ins
maint-NE
maint- FE
maint-FE Pend- ins
INS
Possible Recovery
Route
Continued on next page