DEFINITY Enterprise Communications Server Release 6
Maintenance for R6vs/si
555-230-127
Issue 1
August 1997
Maintenance Commands and Trouble-Clearing Aids
Page 8-331test cdr-link
8
test cdr-link
This command first validates that the Call Detail Recording (CDR) link has been
administered and exists in the switch. Then individual diagnostic tests run on the
link and return results of the test along with any possible error codes. For
information on what a CDR link is and does, see the description in ‘‘
status
cdr-link’’ section of this manual.
Output
The following example shows the output for the test cdr-link primary command.
The responses display on a test-by-test basis with one line of data for each test
result.
1. If no alarms are registered against the maintenance object then the test sequence is run only once. The
long
clear
option forces a clear of all alarms if no errors are encountered during testing. The
short clear
option only
clears alarms pertinent to tests in the short sequence.
2. Refer to the Report Scheduler and System Printer feature specification for more details.
Action/
Object Qualifier Qualifier Description Permissions Defaults
Feature
Interactions
test cdr-link
link-id
short
long
repeat
number
clear
schedule
Link-id =
primary
or
secondary
Option for a brief series of
nondestructive diagnostic tests.
Option for a longer, more
comprehensive test series
(includes a destructive test)
How many times each test in the
sequence is repeated (1-100)
This option causes the test
sequence (short or long) to repeat
until the alarm (if any) is cleared or
a single test in the sequence fails.
1
Command is validated and then a
scheduling form displays to
schedule execution of the
command. The command is then
placed in the command queue and
is executed at the specified time.
The information displayed by the
command is sent to the system
printer instead of the screen.
2
Examples:
test cdr-link primary l
test cdr-link secondary sh r 2
test cdr-link primary
test cdr-link secondary
test cdr-link secondary c
test cdr-link primary schedule
init
inads
craft
Test
sequence
= short;
repeat = 1
none