Page 10-458DIOD-DS1 (DS1 DIOD Trunk)
10
Port Audit and Update Test (#36)
This test sends port level translation data from switch processor to the DS1
Interface circuit pack to assure that the trunk’s translation is correct. Translation
updates include the following data: trunk type (in/out), dial type, timing
parameters, and signaling bits enabled. The port audit operation verifies the
consistency of the current state of trunk kept in the DS1 Interface circuit pack
and in the switch software.
FAIL The NPE of the tested port did not conference the tones correctly. This will
cause noisy and unreliable connections.
1. Replace the circuit pack.
PASS The port can correctly conference multiple connections. User-reported
troubles on this port should be investigated by using other port tests and
by examining station, trunk, or external wiring.
Table 10-151. TEST #36 Port Audit and Update Test
Error
Code
Test
Result Description/ Recommendation
ABORT Internal System Error
1. Retry the command at 1-minute intervals a maximum of 5 times.
2. If the test continues to abort, escalate the problem.
2000 ABORT Response to the test request was not received within the allowable time
period.
2100 ABORT Could not allocate the necessary system resources to run this test.
Continued on next page
Table 10-150. TEST #7 Conference Circuit Test — Continued
Error
Code
Test
Result Description/ Recommendation
Continued on next page