Lucent Technologies lucent Server User Manual


  Open as PDF
of 2392
 
DEFINITY Enterprise Communications Server Release 6
Maintenance for R6vs/si
555-230-127
Issue 1
August 1997
Maintenance Object Repair Procedures
Page 10-207BRI-SET, ASAI-ADJ, BRI-DAT
10
When plugged into the port in this manner, the test set establishes a signaling
link connection with the switch and attempts to complete SPID initialization by
using the Service SPID administered for the system (see the System
Maintenance Administration Form). If the test set displays the correct
administered port address for the endpoint or adjunct under test, the test passes
(see Service SPID Display which follows). If after one-minute nothing is displayed
on the test set, the test fails.
Table 10-74. SPID Facility Test
Test
Result Description/ Recommendation
FAIL No response is received from the endpoint.
1. Check the physical wiring between the switch and the endpoint or adjunct.
2. If test continues to fail, escalate to the next tier.
FAIL Display does not match administered port address for the endpoint or adjunct.
1. Change station administration for endpoint or adjunct to match displayed port
address.
2. If test continues to fail, escalate the problem.
PASS Display matches administered port address for the endpoint or adjunct.
For BRI endpoints:
1. Verify that the SPID values administered in the switch and the endpoint are
consistent.
2. If the SPID values are correct, replace the endpoint.
3. If test continues to fail, escalate the problem.
For ASAI adjuncts:
1. Verify that the TEI values administered in the switch and the adjunct are
consistent.
2. If the TEI values are correct, consult the recommended repair procedures of the
manufacturer for the adjunct.
3. If test continues to fail, escalate the problem.
Continued on next page