Lucent Technologies lucent Server User Manual


  Open as PDF
of 2392
 
DEFINITY Enterprise Communications Server Release 6
Maintenance for R6vs/si
555-230-127
Issue 1
August 1997
Maintenance Object Repair Procedures
Page 10-1303TBRI-TRK (TN2185 ISDN Trunk-Side BRI)
10
Service State Audit (#256)
This test is non-destructive.
This test performs a service state audit on an ISDN B-Channel. The test passes if
Call Processing informs Maintenance that the Restart message was transmitted
successfully, or if the B-Channel was busy and could not send the message.
The test fails if the board is not inserted or translated properly, or if a reply is not
received within a certain amount of time.
The test aborts if the signaling link is disconnected, if a message is already
outstanding, or if the necessary resources could not be allocated.
To investigate the service state of the TN2185 ISDN Trunk-Side BRI Channel,
issue the status trunk trunk-group/trunk-member command.
8 FAIL The signaling link is down.
1. Consult the procedures for the TBRI-PT maintenance object.
9 FAIL The port is out of service.
1. Return the port to an in-service state.
PASS The signaling link is connected and operating normally.
Table 10-451. TEST #256 Service State Audit Test
Error
Code
Test
Result Description/ Recommendation
1000 ABORT System resources required to run this test are not available. The port may
be on a valid call. Use status trunk to determine when trunk is available
for testing.
1. Check the results of Test #1251 (Signaling Link State Check).
1018 ABORT The test is disabled.
1. Enable maintenance by entering y in the
Maintenance Tests?
field on page 2 of the change trunk-group form.
Continued on next page
Table 10-450. TEST #1251 Signaling Link State Test Continued
Error
Code
Test
Result Description/ Recommendation
Continued on next page