DEFINITY Enterprise Communications Server Release 6
Maintenance for R6vs/si
555-230-127
Issue 1
August 1997
Maintenance Commands and Trouble-Clearing Aids
Page 8-394test synchronization
8
Output
The responses display on a test-by-test basis with one line of data displayed for
each test result. The following screen is an example of the output for the test
synchronization short command.
1. If no alarms are registered against the maintenance object then the test sequence is run only once. The
long
clear
option forces a clear of all alarms if no errors are encountered during testing. The
short clear
option
only clears alarms pertinent to tests in the short sequence.
2. Refer to the Report Scheduler and System Printer feature specification for more details.
Action/
Object Qualifier Qualifier Description Permissions Defaults
Feature
Interactions
test synch
short
long
repeat
number
clear
schedul
e
Option for a brief series of
nondestructive diagnostic tests.
Option for a longer, more
comprehensive series of both
destructive and nondestructive
diagnostic tests.
How many times each test in the
sequence is repeated (1-100)
This option causes the test
sequence (short or long) to repeat
until the alarm (if any) is cleared or
a single test in the sequence fails.
1
Command is validated and then a
scheduling form displays to
schedule execution of the
command. The command is then
placed in the command queue and
is executed at the specified time.
The information displayed by the
command is sent to the system
printer instead of the screen.
2
Examples:
test synchronization r 3
test synchronization sh r 1
test synchronization sh r 1
schedule
test synchronization l
init
inads
craft
Test
Sequence
= short;
Repeat =
1
none