DEFINITY Enterprise Communications Server Release 6
Maintenance for R6vs/si
555-230-127
Issue 1
August 1997
Maintenance Object Repair Procedures
Page 10-1206SW-CTL (Switch Control)
10
Control Channel Transmission Test (#94)
Control channel messages are sent from the SPE to selected port circuit packs
and the response from the port circuit packs is checked. This tests the ability of
the Switch Control to send and receive messages on the control channel of the
TDM Bus.
This test cannot run on the Standby SPE Switch Control. Therefore, it is possible
to have defective hardware on the Standby Network Control circuit pack that is
not detectable.
Table 10-416. TEST #94 Control Channel Transmission Test
Error
Code
Test
Result Description/ Recommendation
0 ABORT The port circuit packs necessary for this test are not available.
1. Retry the command at 1-minute intervals a maximum of 5 times.
2. If the test keeps aborting for this reason, then the Network Control
circuit pack should be replaced.
1030 ABORT The Switch Control on the Standby SPE is being tested.
1. For recommended maintenance procedure, refer to ABORT Error Code
1030 in STBY-SPE Maintenance documentation.
2012 ABORT Internal system error
2013
2100
none
ABORT Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals a maximum of 5 times.
1029
2014
2015
2016
2017
2018
2020
2022
2024
2025
2051
ABORT Refer to STBY-SPE for a description of these error codes.
Continued on next page