DEFINITY Enterprise Communications Server Release 6
Maintenance for R6vs/si
555-230-127
Issue 1
August 1997
Maintenance Object Repair Procedures
Page 10-473DIOD-TRK (DIOD Trunk) [G1.2SE]
10
Table 10-158. TEST #36 Port Audit Update Test
Error
Code
Test
Result Description/ Recommendation
ABORT Could not allocate the necessary system resources to run this test.
1. Retry the command at one-minute intervals a maximum of five times.
2. If the test continues to abort, escalate the problem.
2100 ABORT Could not allocate the necessary system resources to run the test.
FAIL Internal System Error.
1. Retry the command at one-minute intervals a maximum of five times.
2. If test continues to fail, escalate the problem.
PASS This test passed. Translation information was successfully updated on the
circuit pack. User-reported troubles on this port should be investigated by
using other port tests and by examining trunk or external wiring. If the trunk
is busied out, the test does not run, but returns PASS. To verify that the
trunk is in-service:
1. Enter status-command to verify that the trunk is in-service. If the trunk
is in-service, no further action is necessary. If the trunk is
out-of-service, continue to Step 2.
2. Enter release-trunk command to put trunk back into in-service.
3. Retry the test command.
Continued on next page