DEFINITY Enterprise Communications Server Release 6
Maintenance for R6vs/si
555-230-127
Issue 1
August 1997
Maintenance Commands and Trouble-Clearing Aids
Page 8-180release pms-link
8
Feature Interactions
High or Critical Reliability Systems disallow attempts to release the
packet-control that resides in the standby control complex.
When packet-controls in the active control complex are released from previous
busied-out states, connectivity across Packet Buses reestablish. ISDN-BRI
point-to-point signaling links reestablish with the release packet-control
command.
Output
The following output example is a display of the release packet-control 1A
command.
Field descriptions
release pms-link
The release pms-link command deactivates MOs that are associated with a
property management system link.
These links provide asynchronous data connections from switches to
peripherals; they are composed of a:
■ Far end data module
■ Simulated data channel on a NETCON board
Port
Cabinet-Carrier where Packet-Control resides.
Maintenance Name
PKT-CTRL.
Alt. Name
Not applicable.
Result
Success status of a busied out object (PASS, ABORT, FAIL).
Error Code
System-generated description of a command failure.
release packet-control 1A
COMMAND RESULTS
Port Maintenance Name Alt. Name Result Error Code
1A PKT-CTRL PASS
Command successfully completed