DEFINITY Enterprise Communications Server Release 6
Maintenance for R6vs/si
555-230-127
Issue 1
August 1997
Maintenance Object Repair Procedures
Page 10-956PI-LINK (Processor Interface Link)
10
Notes:
a. A permanent switched call was dropped. Check the "Link Recovery"
section.
1. Run the Short Test Sequence first. If all tests pass, run the Long Test Sequence. Refer to the
appropriate test description and follow the recommended procedures.
2. Major and Minor alarms on this MO may be downgraded to Warning alarms based on the value
used in the set options command.
3. This error type initially raises a warning alarm. If this error type persists, and alarms are not
downgraded on this MO due to the values of set options, then, after a period of time, a Major alarm
is raised.
769 Any PI Loop Around Test
(#182)
WARNING ON test link lnk-no l r 2
1025 Any TDM Loop Around
Test (#183)
WARNING OFF test link lnk-no l r 2
1281 (n) Any none WARNING/
MAJOR
3
OFF test link lnk-no sh r 2
1537 (e) Any none WARNING/
MAJOR
3
OFF busyout/release link
lnk-no
1793 (f) Any none WARNING OFF busyout/release link link
no.
2049 (g) Any none WARNING/
MAJOR
3
OFF test link lnk-no sh r 9
2305 (h) Any none WARNING OFF test link lnk-no sh r 9
2561 (i) Any none WARNING OFF busyout/release link
lnk-no
2817 (j) Any none NONE OFF busyout/release link
lnk-no
3073 (k) Any none WARNING OFF test link lnk-no sh r 9
3585 (l) Any none MAJOR/
WARNING
2
OFF busyout/release link
lnk-no
3841 (m) Any none MINOR/
WARNING
2
OFF busyout/release link
lnk-no
Table 10-322. PI-LINK (Processor Interface Link) Error Log Entries — Continued
Error
Code
Aux
Data Associated Test Alarm Level
On/Off
Board Test to Clear Value
Continued on next page