DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si
555-230-123
Issue 1
April 1997
Maintenance Object Repair Procedures
Page 10-78ANL-LINE (8-Port Analog Line), ANL-NE-L (8-Port Neon Analog Line)
10
Figure 10-3. Analog Loop Around and Conference Test
Table 10-30. TEST #47 Loop Around and Conference Test
Error
Code
Test
Result Description/ Recommendation
ABORT Could not allocate the necessary system resources to run this test.
1. Retry the command at one-minute intervals a maximum of five times.
7 ABORT The port was seized by a user for a valid call.
1. Enter display port PCSSpp to determine the station’s extension. Enter
status station extension to determine the service state of the port. If
the port is in use, it will be unavailable for certain tests. Wait until the
port is idle before retesting.
2. If the port is idle, retry the command at 1-minute intervals up to 5 times.
Continued on next page
TONE
LEVEL
MEASUREMENT
TONE
SOURCE
TDM BUS
B
C
O
N
*
BFC BATTERY FEED AND HYBRID CHIP