DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si
555-230-123
Issue 1
April 1997
Maintenance Object Repair Procedures
Page 10-754HYB-LINE (Hybrid Line)
10
Table 10-210. TEST #58 Hybrid Line Local Digital Loop
Around Test
Error
Code
Test
Result Description/ Recommendation
ABORT Internal System Error.
1. Retry the command at one-minute intervals a
maximum of five times.
2. If the test continues to abort, escalate the problem.
1000 ABORT System resources required to run this test are not
available. The port may be busy with a valid call. Use the
display port PCSSpp command to determine the station
extension number of the port. Use the status station
command to determine the service state of the port. If
the service state indicates that the port is in use, then the
port is unavailable for certain tests. (Refer to the "Status
Commands" section in Chapter 10, "Maintenance
Commands and Trouble-Clearing Aids" for a full
description of all possible states.) You must wait until the
port is idle before retesting. Attendants are always in use
(off-hook) if the handset is plugged in and the port is not
busied out.
1. If the port status is idle, then retry the command at
one-minute intervals a maximum of five times.
2. If the test continues to abort, escalate the problem.
1004 ABORT The port was seized by a valid call during the test. The
test has been aborted. Use the display port PCSSpp
command to determine the station extension number of
the port. Use the status station command to determine
the service state of the port. If the service state indicates
that the port is in use, then the port is unavailable for
certain tests. (Refer to the "Status Commands" section in
Chapter 10, "Maintenance Commands and
Trouble-Clearing Aids" for a full description of all
possible states.) You must wait until the port is idle
before retesting. Attendants are always in use (off-hook)
if the handset is plugged in and the port is not busied
out.
1. Retry the command at one-minute intervals a
maximum of five times.
2. If the test continues to abort and the port is not in
use, escalate the problem.
Continued on next page