DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si
555-230-123
Issue 1
April 1997
Maintenance Object Repair Procedures
Page 10-1203RING-GEN (Analog Ring Generator)
10
Table 10-373. TEST #118 Analog Ring Generator Query Test
Error
Code
Test
Result Description/ Recommendation
1
1000
1001
1003
1115
2012
2100
ABORT Could not seize the resources to run the test. Other
maintenance is running on the active tone/clock circuit
pack.
1. Wait for the green LED on the active tone/clock
circuit pack to go out; (use the status port-network
command to determine the Active tone/clock circuit
pack).
2. Rerun the test. If the test aborts again, refer to
TDM-CLK (TDM Bus Clock) Maintenance
documentation.
2000 ABORT Response to the request was not received within the
allowable time period.
1. Look for TDM-CLK errors and alarms. Resolve all
other tone/clock problems first.
2. Rerun the test.
1005 ABORT The tone/clock is unable to read the analog ringing
voltage level when the tone/clock is in the Processor
Interface slot. This test is not available for the Processor
Port Network in this configuration.
Continued on next page