Maintenance Object Repair Procedures
Page 10-755HYB-LINE (Hybrid Line)
10
2000 ABORT Response to the test request was not received within the
allowable time period.
1. Retry the command at one-minute intervals a
maximum of five times.
2. If the test continues to abort, escalate the problem.
1,2,3 FAIL The control channel between the processor and the port
is not transmitting properly. This port is not operable.
1. Retry the test.
2. If the failure still occurs, issue the busyout and the
release busy commands, and then retest.
3. If the failure is occurring on more than one port on
the board, suspect the board.
4. If the failure is occurring on several boards in the
same carrier, escalate the problem.
5. If the failure still occurs and appears to be isolated to
one port, check all wiring to the set and all set
connections.
6. Replace the circuit pack as a last resort.
PASS Hybrid Line Local Digital Loop Around Test passed. The
control channel is transmitting properly.
1. If complaints still exist, investigate by using other
circuit pack tests, and by examining the station,
wiring, and connections.
Table 10-210. TEST #58 Hybrid Line Local Digital Loop
Around Test — Continued
Error
Code
Test
Result Description/ Recommendation