DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si
555-230-123
Issue 1
April 1997
Maintenance Object Repair Procedures
Page 10-1130POWER (Battery & Battery Charger) for AC-Powered Systems
10
4FAIL
(cont’d.)
3. If the batteries were replaced, it can take up to 24
hours for the new batteries to be charged (new
batteries are shipped uncharged). If Test #5 is run
again before the batteries are completely charged,
the test fails. If the charger was replaced, some time
must be allowed for the new charger to recharge the
batteries. Therefore, in either case, wait at least 24
hours and rerun the test. If the test still fails, the
PR-MAINT (Maintenance/Tape Processor) in a
multicarrier cabinet PPN system without High or
Critical Reliability, the DUPINT (Duplication)
Interface circuit pack in a PPN for a system with
High or Critical Reliability, or the EPN MAINT
(Maintenance) circuit pack in an EPN could be
reporting this condition incorrectly. There are failures
that can occur on the Maintenance/Tape Processor,
Duplication Interface, and EPN Maintenance circuit
pack that ARE NOT be detected by the respective
maintenance, but that cause many, if not all,
environment tests to fail. If many environment tests
are failing, the suspect circuit pack, depending on
the system configuration, should be replaced and
the test rerun. Resolve all alarms on these MOs, and
rerun the test. If the test still fails, escalate the
problem.
6 FAIL This indicates that Error Codes 2 and 4 have occurred.
Refer to these descriptions. Also, refer to the description
for Error Code 14 for this test.
Table 10-332. TEST #5 Battery & Battery Charger Query Test — Continued
Error
Code
Test
Result Description/ Recommendation
Continued on next page