DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si
555-230-123
Issue 1
April 1997
Maintenance Object Repair Procedures
Page 10-1401TDM-BUS (TDM Bus)
10
System Technician-Demanded Tests:
Descriptions and Error Codes
Use the list configuration control command to find the Tone-Clock circuit pack
code of the system, and then proceed to look for the Short and Long Test
Sequences according to the Tone-Clock circuit pack code.
Always investigate tests in the order presented in the following tables when
inspecting errors in the system. By clearing error codes associated with the
SAKI
Reset Test
, for example, you may also clear errors generated from other tests in
the testing sequence.
Table 10-423. TEST #297 Digit Detection Test
Error
Code
Test
Result Description/ Recommendation
none,
1001
2100
ABORT Could not allocate the necessary system resources to run this test.
1005 ABORT Since this test is valid only on the non-control channel bus, it aborts
execution when run on the control channel bus. This is a valid response.
Use the status system command to verify which bus is the control channel
bus.
2000 ABORT Response to the test request was not received within the allowable time
period.
1. Retry the command at 1-minute intervals a maximum of 5 times.
none FAIL This failure indicates that communication on the Non-Control Channel is not
reliable.
1. Execute the command again.
2. If the problem persists, test the Tone-Clock circuit pack and Tone
Detector circuit pack to make sure they are healthy. Refer to TONE-BD
(Tone-Clock Circuit Pack), TONE-PT (Tone Generator), GPTD-PT
(General Purpose Tone Detector Port), and DTMR-PT (Dual Tone
Multifrequency Port).
3. Execute the command again.
4. If the problems persists, refer to the ‘‘
TDM Bus Fault Detection and
Isolation Procedure’’ described earlier.
PASS The non-control channel bus is operational.
Continued on next page