DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si
555-230-123
Issue 1
April 1997
Maintenance Object Repair Procedures
Page 10-1344SYSTEM (System)
10
Notes:
a. A System Restart Level 3 was requested.
b. A System Restart Level 2 was requested. This can happen due to a loss of
tones (due to a faulty Tone-Clock circuit pack).
c. A System Restart Level 1 was requested.
d. A process trapped.
e. A Restart Level 2 occurred due to a power loss.
f. A Restart Level 2 occurred due to a tone clock loss.
g. An error occurred during initialization.
h. An error occurred while loading translations and the system requested a
Restart Level 3.
i. A process was reset.
j. In a Generic 1 system configured with High or Critical Reliability, a
scheduled SPE-interchange was blocked because a tape operation was
in progress.