DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si
555-230-123
Issue 1
April 1997
Maintenance Object Repair Procedures
Page 10-1612UDS1-BD (UDS1 Interface Circuit Pack)
10
Table 10-472. TEST #1212 CPE Loopback Jack Test
Error
Code
Test
Result Description/ Recommendation
ABORT Internal System Error
1. Retry the
test ds1-loop PCSS
cpe-loopback-jack-test-begin
command at
1-minute intervals a maximum of 5 times.
2. If the test continues to abort, escalate the problem.
1005 ABORT CPE Loopback Jack Test cannot be executed in the
current configuration. To run this test, the TN464F or
later suffix UDS1 must be administered for 24-channel
operation. The "Bit Rate" field on the DS1 circuit pack
administration form must be set to "1.544" for 24-channel
operation.
1015 ABORT Ports on the UDS1 Interface circuit pack have not been
busied out to out-of-service.
1. Enter the busyout board PCSS command to put all
trunks or ports of the UDS1 Interface circuit pack
into the out-of-service state.
2. Retry the command.
3. If the test continues to abort, escalate the problem.
1039 ABORT The UDS1 Interface circuit pack is providing timing for
the system. Executing this test could cause major
system disruption. If the UDS1 Interface circuit pack
needs to be tested, set the synchronization reference to
another DS1 Interface circuit pack or to the Tone-Clock
circuit pack via the following command sequence:
1. Issue the disable synchronization-switch
command.
2. Issue the set synchronization PCSS command.
3. Issue the enable synchronization-switch
command. Then rerun the test. If the test aborts
again, a different ABORT error code will be
generated. Follow the recommended maintenance
procedures for that error code.
Continued on next page