DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si
555-230-123
Issue 1
April 1997
Initialization and Recovery
Page 4-6Reset System 5 (System Reboot and Run All 24-Hour Tests)
4
The boot image is already in the flash ROM memory. The system reboots
immediately after the LMM performs a series of diagnostics on the processor and
memory. Translations reload from the translation card. Depending on the
translation, the reloading process takes from five to 30 seconds. Thereafter, all
port circuit packs are reset, and all telephone sessions drop. Telephones begin
to reconnect to the switch within 30 seconds. In a large system, reconnection of
all telephones may take up to five minutes. Finally, scheduled maintenance is
initiated. Typical displays in a Release 5vs/si system follow:
Typical Display (TN790 Release 5 and Later)
INTERNAL REGISTER TEST PASSED
LOCAL BUS TEST PASSED
ROM CHECKSUM TEST PASSED
CONTROL STATUS TEST PASSED
DCACHE TEST PASSED
ICACHE TEST PASSED
WRITE BUFFER TEST PASSED
BTO TEST PASSED
MEM CONFIG TEST PASSED
MEMORY FUNCTIONAL TEST PASSED
MEMORY MODULE A STUCK BIT TEST PASSED
MEMORY MODULE A PARITY TEST PASSED
MEMORY MODULE A BURST TEST PASSED
MEMORY MODULE A COUPLE TEST PASSED
MEMORY MODULE B STUCK BIT TEST PASSED
MEMORY MODULE B PARITY TEST PASSED
MEMORY MODULE B BURST TEST PASSED
MEMORY MODULE B COUPLE TEST PASSED
MEMORY MODULE C STUCK BIT TEST PASSED
MEMORY MODULE C PARITY TEST PASSED
MEMORY MODULE C BURST TEST PASSED
MEMORY MODULE C COUPLE TEST PASSED
VIRTUAL MEMORY TEST PASSED
Continued on next page