DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si
555-230-123
Issue 1
April 1997
Maintenance Object Repair Procedures
Page 10-1096PKT-CTRL (Packet Control Circuit Pack)
10
k. If the specified Packet Control circuit pack is in the active SPE, it must first
be busied-out via the busyout packet-control C command. After testing
has been completed, the Packet Control circuit pack should be released
from the busyout state via the release packet-control C command.
System Technician-Demanded Tests:
Descriptions and Error Codes
When inspecting errors in the system and deciding which ones to address,
always investigate errors in the order they are presented in the tables below. By
clearing error codes associated with the
Packet Control Parity Circuitry Test,
for
example, you may also clear errors generated from other tests in the testing
sequence.
Packet Control Error Counter Read and Clear Test
(#583)
This test involves reading and clearing the error counters on the Packet Control
circuit pack. The test is performed by sending multiple maintenance requests to
the Packet Control circuit pack and waiting for the response to each of the "read
and clear" commands from the circuit pack.
1. D = Destructive; ND = Nondestructive
1. D = Destructive; ND = Nondestructive
Table 10-321. Active PKT-CTRL
Order of Investigation
Short Test
Sequence
Long Test
Sequence D/ND
1
Packet Control Reset Test (#586) D
Packet Control Parity Circuitry Test (#584) X ND
Packet Control Loop Around Test (#585) X X ND
Packet Control Error Counter Read and Clear Test (#583) X ND
Table 10-322. Standby PKT-CTRL
Order of Investigation
Short Test
Sequence
Long Test
Sequence D/ND
1
Packet Control Reset Test (#586) X X ND
Packet Control Loop Around Test (#585) X X ND
Packet Control Error Counter Read and Clear Test (#583) X X ND